*Duplicate Submission* Permanent Fire Station 5 Rebuild Project

4 Documents in Project

Summary

SCH Number
2021100480
Lead Agency
City of Santa Rosa
Document Title
*Duplicate Submission* Permanent Fire Station 5 Rebuild Project
Document Type
NOD - Notice of Determination
Received
Posted
2/16/2022
Document Description
*Duplicate NOD Submission. Please refer to https://ceqanet.opr.ca.gov/2021100480/4 The approximately 2.11-acre project site is in the northwest portion of a larger property located at 1400 Fountaingrove Parkway (APN 173-670-022). The site is currently undeveloped and does not have a separate address listed by the City. The proposed project is called the Permanent Fire Station 5 Rebuild Project (Project). The project is a replacement of a temporary facility located approximately 4,000 feet southeast from the proposed project site at 3480 Parker Hill Road. Development would occur in two areas of the parcel. The western portion of the site would be developed with a new 10,763 square-foot, two-story, fire station building. At its tallest point, the fire station would be 29 feet tall. On the east side of the site (in the panhandle), a paved parking lot with approximately 20 spaces would be developed. Trees and landscaping destroyed by the Tubbs Fire would be replaced between the fire station and the parking lot. Other proposed improvements to support the new fire station include road median and striping improvements, light signalization changes, and relocation of an aboveground PG&E transformer

Contact Information

Name
Lisa Welsh, Associate Civil Engineer
Agency Name
City of Santa Rosa, Transportation and Public Works Department
Job Title
Associate Civil Engineer
Contact Types
Lead/Public Agency

Location

Cities
Santa Rosa
Counties
Sonoma
Regions
Citywide
Cross Streets
Stagecoach Road and Fountaingrove Parkway
Zip
95401
Total Acres
2.11
Jobs
17
Parcel #
173-670-022
State Highways
101, 12
Schools
Hidden Valley Elementary, St. Rose School
Waterways
Fountaingrove Lake, Russel Creek

Notice of Determination

Approving Agency
City of Santa Rosa City Council
Approving Agency Role
Lead Agency
Approved On
County Clerk
Sonoma
Final Environmental Document Available at
http://cippublic.srcity.org/ProjPages/2184.html

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search Print