Cobbler Timber Harvest Plan No. 4-21-00047/TUO (Streambed Alteration Agreement No. 1600 2021 0004-R4)

Summary

SCH Number
2021100336
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Cobbler Timber Harvest Plan No. 4-21-00047/TUO (Streambed Alteration Agreement No. 1600 2021 0004-R4)
Document Type
NOD - Notice of Determination
Received
Posted
10/20/2021
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement No. 1600-2021-0004-R4, pursuant to section 1611 of the Fish and Game Code to the project Applicant, Sierra Pacific Industries. Project activities include installation of both temporary and permanent vented fords, construction of a rocked dip, construction of a rocked inside ditch/dip, and operations and other activities at water drafting sites, related to the Cobbler Timber Harvest Plan in Tuolumne County, No. 4-21-00047/TUO.

Contact Information

Name
Margarita Gordus
Agency Name
CA Department of Fish and Wildlife
Contact Types
Responsible Agency

Location

Counties
Tuolumne
Waterways
North Fork nad Middle Fork Stanislaus River
Other Location Info
The Project locations occur in Township 4 N, Range 16 E, Sections 2 and 5; Township 4 N, Range 17 E, Sections 7, 10 and 16; and Township 5 N, Range 16 E, Sections 16, 17, 21, 22, 25, 26, and 32 to 36; in the Boards Crossing, Crandall Peak, Strawberry and Stanislaus USGS 7.5 minute quadrangles; east of Highway 4 between the North Fork and Middle Fork Stanislaus River, in Tuolumne County.

Notice of Determination

Approving Agency
Julie A. Vance, CDFW Central Region
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Timber Harvest Plan)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print