Sediment Remediation Project, Piers 39 to 43.5

5 Documents in Project

Summary

SCH Number
2021100323
Lead Agency
California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB)
Document Title
Sediment Remediation Project, Piers 39 to 43.5
Document Type
NOD - Notice of Determination
Received
Posted
4/25/2025
Document Description
The San Francisco Bay Regional Water Quality Control Board (Water Board) Sediment Remediation Project, Piers 39 to 43½ (Project) entails the remediation of offshore sediment at Piers 39 to 43½ (the Remedial Area) within the Port of San Francisco and the Montezuma material handling facility (MHF) location for dewatering and loading sediments for transport to approved disposal facilities. Since 2016, Pacific Gas and Electric Company (PG&E) has investigated the nature, distribution, and extent of sediment contamination within the Remedial Area. Some sediments contain elevated concentrations of polycyclic aromatic hydrocarbons (PAHs), which are chemicals found in petroleum and by-product waste formed from manufactured gas plant operations. Impacts in sediments occur close to the shoreline and extend bayward in five areas within the Remedial Area. A Feasibility Study/Remedial Action Plan (FS/RAP) details the planned cleanup of offshore Bay sediments. The Remedial Area encompasses Pier 39 and the intertidal and subtidal area between Pier 39 and Pier 43½ along the margin of San Francisco, extending into San Francisco Bay to the north of The Embarcadero, approximately between Taylor and Kearny streets. The bayward limits of the Remedial Area extend approximately 1,000 feet offshore. The Remedial Area includes a small craft marina; multiple piers housing vessels for bay excursions, cruises, sailing, fishing, and ferry operations; and a high concentration of visitor-related commercial development (shops and restaurants). The adjacent upland area consists of densely developed commercial areas including parking lots, hotels, shops, restaurants, pedestrian and bicycle pathways, a playground, and some park areas. The purpose of the proposed Project is to remediate (i.e., clean up) sediments impacted (i.e., contaminated) with PAHs within the Remedial Area to protect human health and the environment. The recommended remedial alternative proposes dredging to remove contaminated sediment and capping to prevent exposure to remaining contaminated sediments that might pose risk through bioaccumulation. Placement of armoring where necessary during capping would protect installed sand caps or existing sediment from scour or disturbance that might expose sediment with elevated PAH concentrations. Dredged sediment would be transported by barge to a MHF where it would be offloaded and dried sufficiently to allow for transportation to a licensed landfill. MHFs for the project include the Montezuma Material Handling Facility (MHF) in Solano County, as well as the Duwamish Reload Facility in Seattle Washington. Licensed landfills include facilities in California and Oregon.

Contact Information

Name
Ross Steenson
Agency Name
San Francisco Bay Regional Water Quality Control Board
Job Title
Assistant Executive Officer
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
San Francisco
Counties
San Francisco, Solano
Regions
Citywide, Countywide, San Francisco Bay Area
Other Location Info
Piers 39 to 43½

Notice of Determination

Approving Agency
San Francisco Bay Regional Water Quality Control Board
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Francisco
Final Environmental Document Available at
https://geotracker.waterboards.ca.gov/profile_report.asp?global_id=T10000007367

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV Download All Attachments New Search Print