SR-1 Bike Lane Facilities Improvements Project

4 Documents in Project

Summary

SCH Number
2021100313
Lead Agency
California Department of Transportation, District 12 (DOT)
Document Title
SR-1 Bike Lane Facilities Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
3/25/2022
Document Description
The California Department of Transportation (Caltrans) proposes a safety improvements project on State Route 1 (SR-1) between the Santa Ana River Bridge (PM 21.5) and Anderson Street (PM 31.1) in the City of Huntington Beach (City), in the County of Orange. The project proposes to add comprehensive Class II bike lanes in both directions along SR-1 within the stated limits to move towards Caltrans’ Complete Streets directive. Additional proposed safety elements for bicyclists are widening of right-turn pockets, widening of existing shoulders; removing existing sand deposits along the roadway; installing a concrete center median barrier; replacing and refreshing lane and shoulder striping; implementing bicyclist detection sensors at signalized intersections; upgrading curb side grated inlets to be bike-rated; and installing signage from Anderson Street to Santa Ana River Bridge; upgrading guardrail at the Bolsa Chica Ecological Reserve; and relocation of traffic signal and lighting poles. Other elements proposed includes installing two traffic census stations at Goldenwest Street and Warner Avenue: and upgrading an existing traffic signal pole at the northwest corner of SR-1 and Seal Beach Boulevard (PM 32.7). There are 2 alternatives, the Build and No Build Alternatives.

Contact Information

Name
Carmen Lo
Agency Name
Caltrans District 12
Job Title
Associate Environmental Planner
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Huntington Beach, Seal Beach
Counties
Orange
Regions
Citywide
Cross Streets
Anderson Street/PCH, Santa Ana River Bridge/PCH
State Highways
SR-1
Railways
NA
Airports
NA
Schools
NA
Waterways
NA
Township
NA
Range
NA
Section
NA
Base
NA

Notice of Determination

Approving Agency
Caltrans District 12
Approving Agency Role
Lead Agency
Approved On
County Clerk
Orange
Final Environmental Document Available at
https://dot.ca.gov/caltrans-near-me/district-12/district-12-programs/district-12-environmental/sr-1-bike-lane-project

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (CE under NEPA)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print