Upper Bidwell Park Road Sediment Reduction Proejct

3 Documents in Project

Summary

SCH Number
2021100028
Lead Agency
City of Chico
Document Title
Upper Bidwell Park Road Sediment Reduction Proejct
Document Type
NOD - Notice of Determination
Received
Posted
1/24/2022
Document Description
The proposed project will implement sediment control practices through reduction of road erosion and sediment delivery from 43 potential erosion sites on Upper Park Road in Upper Bidwell Park located within the Big Chico Creek (BCC) Watershed. To reduce salmonoid habitat degradation, and sediment delivery to BCC and ultimately the Sacramento River basin, this project will upgrade and storm proof portions of Upper Park Road within the BCC sub-basin. The action plan includes treating 43 features on the 3.42 miles of road for erosion control and sediment prevention. Individual treatment features include 40 stream crossings, 2 ditch relief culverts, and 1 spring, as well as road surface drainage and associated erosion treatments, such as rolling dips. The Project will require a total of 37 stream improvements by upgrading 22 stream crossings with culvert replacements, and 15 stream crossings improved with armored fill installations. Rolling dips, water bars, outs loping and other typical road drainage treatments will also be installed.

Contact Information

Name
Linda Herman
Agency Name
City of Chico
Job Title
Park & Natural Resources Manager
Contact Types
Lead/Public Agency

Location

Cities
Chico
Counties
Butte
Regions
Citywide
Cross Streets
Wildwood Avenue and Manzanita Avenue
Zip
95928
Parcel #
016-230-001, 056-050-010, 016-240-002
State Highways
California
Railways
Union Pacific
Airports
Chico Municipal Airport
Schools
None
Waterways
Big Chico Creek
Township
23 N
Range
2 East
Section
35
Other Location Info
Work will be conducted at various locations along 3.42 miles Upper Park Road in Upper Bidwell Park

Notice of Determination

Approving Agency
City of Chico
Approving Agency Role
Lead Agency
Approved On
County Clerk
Butte
Final Environmental Document Available at
https://chico.ca.us/post/upper-bidwell-park-road-sediment-reduction-project

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print