Amador SR 88 Roadway Improvements (10-0Q210) (Streambed Alteration Agreement EPIMS Notification No. AMA-37720-R2)

4 Documents in Project

Summary

SCH Number
2021090506
Lead Agency
California Department of Fish and Wildlife, North Central Region 2 (CDFW)
Document Title
Amador SR 88 Roadway Improvements (10-0Q210) (Streambed Alteration Agreement EPIMS Notification No. AMA-37720-R2)
Document Type
NOD - Notice of Determination
Received
Posted
12/1/2023
Document Description
The project includes the relining of the existing 48” double culvert system at PM 8.36. The culvert work is part of a larger roadway improvement project along SR 88, between PM 5.5 and PM 14.3. The project is limited to the clearing and excavation of a 15-foot by 20-foot area at the outfall end of the culvert for a temporary pipe-liner installation pit, relining of the double culvert system with a Snap-Tite Culvert Lining System, water diversion installation, and riparian vegetation removal consisting of narrow-leaf willows below the top of the bank of Copper Creek.

Contact Information

Name
Mary Xiong
Agency Name
California Department of Fish and Wildlife
Job Title
Senior Environmental Scientist, Specialist
Contact Types
Responsible Agency

Location

Counties
Amador
Regions
Northern California
Waterways
Copper Creek
Township
06N
Range
10E
Section
29 1/4
Other Location Info
State Route (SR) 88 at post mile (PM) 8.36

Notice of Determination

Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Amador
Final Environmental Document Available at
CDFW’s regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print