Pine Mountain Tunnel Tanks Replacement Project
4 Documents in Project
Summary
SCH Number
2021090343
Lead Agency
Marin Municipal Water District
Document Title
Pine Mountain Tunnel Tanks Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
8/3/2023
Document Description
Marin Water proposes to cease using the Pine Mountain Tunnel for water storage, and to replace the existing storage by building two, 2-million gallon concrete water storage tanks on Marin Water's watershed property. Potentially contaminated excavated soils (approximately 5,650 cubic yards) would be hauled to the Potrero Landfill in Fairfield, instead of Redwood Landfill.
Contact Information
Name
Alex Anaya
Agency Name
Marin Municipal Water District
Job Title
Engineering Manager, Design
Contact Types
Lead/Public Agency
Phone
Email
Location
Cities
Fairfax, Ross
Counties
Marin
Regions
Citywide, Countywide, Northern California, San Francisco Bay Area
Cross Streets
Bolinas Road near Sky Oaks Road
Notice of Determination
Approving Agency
Marin Municipal Water District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Marin
Final Environmental Document Available at
220 Nellen Ave, Corte Madera, CA 94925
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.