Compliance and Sustainability Project (Project)
4 Documents in Project
Summary
SCH Number
2021090280
Lead Agency
Lake County
Document Title
Compliance and Sustainability Project (Project)
Document Type
NOD - Notice of Determination
Received
Posted
11/27/2023
Document Description
The State Water Resources Control Board (State Water Board) is a Responsible Agency for the Project. The State Water Board’s Drinking Water State Revolving Fund (SRF) Program is financing the Project. Program is financing the Project referred to internally as Compliance and Sustainability Project. The Project includes installation of a new treatment facility, including a new 10’ by 14’ filtration building, installation of a new backwash tank, installation of a new aeration tank on a concrete slab, abandonment of existing Wells #1 and #2, installation of a replacement pump for Well #3, new pipelines for the water system, two new 45,000 gallon storage tanks on concrete slabs, a new concrete retaining wall, removal of two existing 15,000 gallon redwood water tanks and concrete pads, and installation of a permanent back-up power generator.
Contact Information
Name
Abbygayle Britton
Agency Name
State Water Resources Control Board
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Location
Cities
Clearlake, Lakeport
Counties
Lake
Regions
Countywide
Other Information
6030 Sunrise Ct. and 6200 Sunrise Dr., Lower Lake, CA.
Notice of Determination
Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Lake
Final Environmental Document Available at
Records of the financing approval and an analysis of environmental alternatives for the Project are available to the general public upon request at the State Water Board, Division of Financial Assistance at 1001 I Street, 16th Floor, Sacramento, CA 95814. The Mitigated Negative Declaration is available from the Lead Agency.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.