Kaiser Permanente Riverside Medical Center Expansion

4 Documents in Project

Summary

SCH Number
2021090271
Lead Agency
City of Riverside
Document Title
Kaiser Permanente Riverside Medical Center Expansion
Document Type
NOD - Notice of Determination
Received
Posted
7/20/2022
Document Description
The redevelopment of approximately 15.5 acres of the existing 37.5-acre Kaiser Permanente Riverside Medical Center (the Hospital Expansion Site) consisting of a new, approximately 180,474-square-foot, five-story hospital tower with 152 new beds for a total number of 359 beds upon project completion, a new 115,526 square foot two-story diagnostic and treatment (D&T) building, a 5-story (6 decks) aboveground parking structure, and upgrades to the existing central utility plant, including installation of a new emergency generator. The project also includes ancillary features such as a new patient drop-off canopy, driveways, walkways, surface parking, landscaping, lighting, and signage. The project also includes construction of two off-site parking lots at Off-Site Area 1 and Off-Site Area 2. Off-Site Area 1 would include an 87-parking stalls and up to five construction trailers during the project’s construction phase. Off-Site Area 2 would include approximately 516 parking stalls. Project construction would occur over an approximate 4½ -year period in two major build phases. Phase 1 would construct the parking structure at the Hospital Expansion Site and the two off-site parking lots. Phase 2 would construction the new hospital tower and D&T building at the Hospital Expansion Site.

Contact Information

Name
Brian Norton
Agency Name
City of Riverside
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Location

Cities
Riverside
Counties
Riverside
Regions
Countywide
Cross Streets
Magnolia Avenue, Park Sierra Drive and Polk Street
Zip
92505
Total Acres
21.81
Jobs
332
Parcel #
138-470-010, 142-293-028, 132-020-033
State Highways
Route 91
Railways
Metrolink
Airports
N/A
Schools
La Sierra High School, Collett Elementary School
Waterways
Riverside Canal
Township
3S
Range
6W
Section
18, 19
Base
SBBM

Notice of Determination

Approving Agency
City of Riverside
Approving Agency Role
Lead Agency
Approved On
County Clerk
Riverside
Final Environmental Document Available at
City of Riverside, Community Development Department, Planning Divisions 3900 Main Street, Riverside CA, 92522

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print