Redlands General Plan Transit Villages District and Specific Plan Project

3 Documents in Project

Summary

SCH Number
2021080622
Lead Agency
City of Redlands
Document Title
Redlands General Plan Transit Villages District and Specific Plan Project
Document Type
NOD - Notice of Determination
Received
Posted
10/19/2022
Document Description
The 2035 General Plan (GP2305) includes more than 100 policies and actions related to the future development of transit villages around the new Arrow passenger rail line stations in the City. Of the five Arrow rail stations that were shown in the GP2035, three are currently being built by San Bernardino County Transportation Authority (SBCTA) in the first phase of Arrow’s operation: New York Street/Esri Station, Downtown Station, and University Station. The remaining two stations, which will be located at Alabama Street and California Street, will be built by SBCTA in a later phase of Arrow development, the timing of which is unknown at this time. The proposed Project would advance the GP2035’s present Transit Village Strategy and Concept by amending the GP2035 to establish the new Transit Villages District land use designation to encourage development in the center of town by providing a plan for introducing new residential and commercial uses located within 0.5 mile of each of these three new stations. As a form-based code, the Project would emphasize building form, a mix and density of different uses, strong pedestrian orientation and transit-oriented development, and public realm improvements and amenities. The Project proposes three transit villages: New York Street/Esri Village, Downtown Transit Village, and University Village. The Project identifies allowed land uses and, through the TVSP, provides detailed standards for building placement, height, massing, articulation, frontage, landscape, and parking based on a form-based code. The form-based code incorporates a gradual transitioning of the height and mass of larger buildings from larger to smaller to avoid incompatible buildings heights next to each other. The TVSP’s regulating plan would serve as the zoning map for the TVSP. The Project also includes provisions for transportation and circulation, open space, and infrastructure. The Project provides a framework for complete, multi-modal streets that provide for pedestrians, bicycles, transit patrons, and motorists in a mixed-use environment around the three Arrow stations. The Project also includes parking improvements in the Downtown Transit Village that include on-street parallel parking, angled parking, parking lot expansion, and new parking garages. Moreover, the proposed street and open space network would provide contiguous green space connecting the TVSP villages. Further, the Project identifies the necessary water system infrastructure improvements and the addition of non-potable water mains, and design considerations to address the existing 100-year floodplain as well as means to reduce the floodplain area. The Project requires General Plan Amendments to change land use designations of parcels per Redlands Transit Villages Specific Plan, e.g., to a “Transit Village” land use classification, General Plan Amendments for minor changes to the design or designations of certain street segments, and minor text amendments to one or more policies to achieve consistency as may be required, and a Zone Change to designate the Project area as “Specific Plan" or "SP 65".

Contact Information

Name
Brian Foote
Agency Name
City of Redlands
Job Title
Planning Manager
Contact Types
Lead/Public Agency

Location

Cities
Redlands
Counties
San Bernardino
Regions
Citywide
Cross Streets
Various
Zip
92373
Total Acres
947
Parcel #
Various
State Highways
SR 38; I-10; I-210
Railways
SBCTA Arrow Line
Airports
Redlands Municipal (REI)
Schools
RUSD; University of Redlands
Waterways
Santa Ana River
Township
1S
Range
3W
Section
21-23
Base
SanBern

Notice of Determination

Approving Agency
City of Redlands
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Bernardino
Final Environmental Document Available at
City of Redlands Development Services Department, Planning Division, 35 Cajon Street, Suite 20, Redlands, CA 92373

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print