New Hospital at UCSF Helen Diller Medical Center at Parnassus Heights and Long Range Development Plan Amendment No. 10

5 Documents in Project

Summary

SCH Number
2021070547
Lead Agency
University of California
Document Title
New Hospital at UCSF Helen Diller Medical Center at Parnassus Heights and Long Range Development Plan Amendment No. 10
Document Type
NOD - Notice of Determination
Received
Posted
5/19/2022
Document Description
The proposed project would construct a 15-story, approximately 875,000-gross-square-foot (GSF) new hospital building, renovate approximately 114,000 GSF in the existing Moffitt and Long Hospitals, and seismically upgrade the Moffitt Hospital to maintain a portion of acute care services beyond 2030. The Site and Make-Ready work for the New Hospital includes critical infrastructure and support scope elements required before construction for the New Hospital. A minor amendment to the 2014 LRDP is required to adjust the Mount Sutro Open Space Reserve boundary to accommodate the replacement site for the medical gas tanks, while maintaining the Reserve at a minimum of 61 acres.

Contact Information

Name
Brian Harrington
Agency Name
University of California
Job Title
Director of Physical and Environmental Planning
Contact Types
Lead/Public Agency

Location

Cities
San Francisco
Counties
San Francisco
Regions
San Francisco Bay Area
Other Location Info
University of California, San Francisco, Parnassus Heights campus

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print