Formerly Used Defense Site Camp San Luis Obispo - Munitions Response Site 09- Remedial Investigation / Feasibility Study

2 Documents in Project

Summary

SCH Number
2021070151
Lead Agency
California Department of Toxic Substances Control (DTSC)
Document Title
Formerly Used Defense Site Camp San Luis Obispo - Munitions Response Site 09- Remedial Investigation / Feasibility Study
Document Type
NOD - Notice of Determination
Received
Posted
8/4/2021
Document Description
The purpose of this project is to investigate, identify and/or treat any former military munitions that may be still present at the CSLO Munitions Response Site (MRS) 09. The proposed activities include investigation (by personnel walking the site using battery operated geophysical equipment); excavation with hand tools of individually identified subsurface MEC/anomalies; treatment of collected items, which may include MEC open detonation; and transportation of equipment on existing roads. In accordance with California Health and Safety Code, Chapter 6.8, Section 25300 et seq., the project is the proposed approval by DTSC of a Remedial Investigation / Feasibility Study (RI/FS) Quality Assurance Project Plan (QAPP) for Camp San Luis Obispo (CSLO) (October 2019) to investigate Munitions Response Site (MRS) 09, CSLO. The United States Army Corps of Engineers proposes to execute the RI/FS to define target areas at MRS 09, CLSO (the Site). During the investigation, there is a remote chance that munitions or explosives of concern (MEC) will be found that are unsafe to move and need to be disposed of by detonation.

Contact Information

Name
Jim Adams
Agency Name
DTSC
Contact Types
Lead/Public Agency

Location

Cities
San Luis Obispo
Counties
San Luis Obispo
Cross Streets
2990 Dairy Creek Road
Zip
93405

Notice of Determination

Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print