Port of Stockton Rail Bridge Replacement and Rail Improvements Project

5 Documents in Project

Summary

SCH Number
2021060578
Lead Agency
Port of Stockton
Document Title
Port of Stockton Rail Bridge Replacement and Rail Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
8/23/2023
Document Description
The 60-acre Project will include rail bridge replacement and improvements at the Port of Stockton. Currently, a single-track rail swing bridge over the San Joaquin River connects the East and West Complexes of the Port of Stockton. The existing bridge and all associated piles would be removed. The outdated bridge will be replaced with two single-track rail bridges or a double-track rail, removable span bridge in the same location. The Project will also add 4,000 linear feet of long lead double track to the existing Port rail infrastructure.

Contact Information

Name
Jenna Yang
Agency Name
Central Valley Regional Water Quality Control Board
Job Title
Water Resource Control Engineer
Contact Types
Responsible Agency

Location

Cities
Port of Stockton
Counties
San Joaquin
Regions
Northern California

Notice of Determination

Approving Agency
Central Valley Regional Water Quality Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Joaquin
Final Environmental Document Available at
Port of Stockton, 2201 West Washington Street, Stockton, CA 95203

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print