Havasu-Landing-Whipple 66 kV Subtransmission Line Project (Streambed Alteration Agreement No. EPIMS-SBR-16078-R6)

Summary

SCH Number
2021060291
Public Agency
California Department of Fish and Wildlife, Inland Deserts Region 6 (CDFW)
Document Title
Havasu-Landing-Whipple 66 kV Subtransmission Line Project (Streambed Alteration Agreement No. EPIMS-SBR-16078-R6)
Document Type
NOE - Notice of Exemption
Received
Posted
6/14/2021
Document Description
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement number EPIMS-SBR-16078-R6, pursuant to Section 1602 of the Fish and Game Code to Southern California Edison as represented by Hazem Gabr. The project is limited to the replacement of an aging and damaged infrastructure along 11 miles of the HavasuLanding-Whipple 66-kV subtransmission line prior to in-service failure. This includes upgrading the alignment by replacing existing wood poles, in some cases with more durable tubular steel poles (TSPs), and by reconductoring the subtransmission line. Activities subject to Fish and Game Code section 1602 include the removal and replacement of 11 deteriorated poles, associated infrastructure (i.e., guy wires/anchors), and cable along the subtransmission alignment.

Contact Information

Name
Marina Barton
Agency Name
California Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Location

Counties
San Bernardino
Regions
Southern California
Other Location Info
The Havasu-Landing-Whipple 66 kV Subtransmission Line Project (project) is located within unnamed intermittent and ephemeral washes that are tributaries to the Colorado River, in the County of San Bernardino, State of California; Latitude 34.478498, Longitude -114.417135; Assessor’s Parcel Number 0649-111-03-1104. The project is located within the Mojave Desert and runs parallel to the western shore of Lake Havasu. The project will be conducted along 11 miles of the Havasu-Landing-Whipple 66-kV subtransmission line. The northern end of the project begins at Havasu Lake Landing Substation and proceeds southeast towards the Havasu Substation.

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Categorical Exemption. Class 1 § 15301, Existing Facilities and Maintenance
Reasons for Exemption
Class 1, section 15301; The project is exempt because it includes the operation, repair, and maintenance of existing facilities of investor and publicly-owned utilities used to provide electric power.
County Clerk
San Bernardino

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print