Yerger THP

Summary

SCH Number
2021060251
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Yerger THP
Document Type
NOD - Notice of Determination
Received
Posted
6/10/2021
Document Description
The project is limited to three encroachments including replacement of an existing corrugated metal pipe crossing and water drafting from two existing water drafting sites as identified and described on pages 38, 39, 40, 51, and 74.1, and as shown on pages 69 and 73 of the Timber Harvesting Plan (THP), 2-20-00181-TRI "Yerger."

Contact Information

Name
Keith Greenwood
Agency Name
Registered Professional Forester
Contact Types
Project Applicant

Name
Merissa L. Hanisko
Agency Name
Environmental Scientist
Contact Types
Lead/Public Agency / Responsible Agency

Location

Cities
Weaverville
Counties
Trinity
Regions
Northern California
Township
36N
Range
08W
Section
25
Base
MDB
Other Location Info
The project is located on Hobel Creek, tributary to the East Fork Stuart Fork, tributary to Trinity Lake and an unnamed tributary to Clawton Gulch, tributary to Trinity Lake, in the Davis Creek (1106.400802) and Clawton Gulch (1106.400804) Planning Watersheds, in the County of Trinity, State of California; Township 36N, Range 08W section 25 and Township 35N, Range 08W section 1; Mount Diablo base and meridian; U.S. Geological Survey 7.5 minute quadrangle map Trinity Center

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print