Y Knot Timber Harvest Plan No. 4-20-00185/TUO (Streambed Alteration Agreement No. 1600 2020 0203-R4)

Summary

SCH Number
2021060148
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Y Knot Timber Harvest Plan No. 4-20-00185/TUO (Streambed Alteration Agreement No. 1600 2020 0203-R4)
Document Type
NOD - Notice of Determination
Received
Posted
6/7/2021
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement number 1600-2020-0203-R4, pursuant to section 1611 of the Fish and Game Code to the project Applicant, Sierra Pacific Industries. Project activities include reconstruction of a rocked ford/dip, culvert replacement, permanent crossings, temporary crossings, and operations and other activities at water drafting sites, related to the Y Knot Timber Harvest Plan in Tuolumne County, No. 4-20-00185/TUO.

Contact Information

Name
Erin Duprey
Agency Name
CA Department of Fish and Wildlife
Contact Types
Responsible Agency

Location

Counties
Tuolumne
Waterways
Grisgold Creek; Crane Creek
Other Location Info
The Project location occurs in Township 5 N, Range 16 E, Sections 11, 12, 16 and 17; Township 5 N, Range 17 E, Sections 4, 5, 6 and 7; Township 6 N, Range 17 E, Sections 32 and 33; in the Boards Crossing and Liberty Hill USGS 7.5 minute quadrangles; east of Highway 4 between Griswold Creek and Crane Creek, in Tuolumne County.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Tuolumne
Final Environmental Document Available at
The Timber Harvest Plan prepared for the project is available to the general public at the office location listed above for the Lead Agency.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Timber Harvest Plan)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print