Yolo 80 Corridor Improvements Project

6 Documents in Project

Summary

SCH Number
2021060117
Lead Agency
California Department of Transportation, District 3 (DOT)
Document Title
Yolo 80 Corridor Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
5/22/2024
Document Description
Construct improvements consisting of a High Occupancy Toll 3+ lane in each direction with direct connectors, pedestrian/bicycle facilities, park-n-ride, and Intelligent Transportation System elements including ramp meters, fiber-optic conduit and cables, and overhead signs. Drainage modifications would be required due to median reconstruction in the locations to which sheet flow currently drains on US 50 and I-80, in Sacramento, Solano, and Yolo Counties.

Contact Information

Name
Cherry Zamora
Agency Name
California Transportation Commission
Job Title
Associate Deputy Director
Contact Types
Responsible Agency

Location

Cities
Davis, Sacramento, West Sacramento
Counties
Sacramento, Solano, Yolo
Regions
Northern California
State Highways
I-80, I-50, I-5
Other Location Info
The project is located on Interstate 80 (I-80) from the I-80/Kidwell Road interchange in Solano County, through Yolo County, and to the West El Camino interchange; also on United States Highway 50 (US 50) from the I-80/US 50 interchange to the I-5/US 50 interchange in Sacramento County.

Notice of Determination

Approving Agency
California Transportation Commission
Approving Agency Role
Responsible Agency
Approved On
County Clerks
Sacramento, Solano, Yolo
Final Environmental Document Available at
Caltrans District 3, 703 B Street, Marysville, CA 95901 and California Transportation Commission, 1120 N Street, MS 52, Sacramento, CA 95814.

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print