Coastal Rail Trail Project
2 Documents in Project
Summary
SCH Number
2021060094
Lead Agency
City of Oceanside
Document Title
Coastal Rail Trail Project
Document Type
NOD - Notice of Determination
Received
Posted
12/9/2021
Document Description
The Project consists of Class I path from Oceanside Boulevard to Morse Street, spanning the Loma Alta Creek and running adjacent to the City of Oceanside La Salina Waste Water Treatment Plant (WWTP) and Buccaneer Park. A 255-foot long, two-span cast-in-place concrete deck has been chosen as the preferred bridge type. The Project will close the remaining gap of the Coastal Rail Trail, as well as provide connectivity to Buccaneer Park, and a connection to a future parking lot planned to the north of Loma Alta Creek adjacent to the WWTP.
Contact Information
Name
Mahsima Mohammadi
Agency Name
City of Oceanside
Job Title
Project Manager
Contact Types
Lead/Public Agency / Project Applicant
Phone
Location
Coordinates
Cities
Oceanside
Counties
San Diego
Regions
Citywide
Cross Streets
S. Pacific Street and Morse Street
Zip
92054
Total Acres
12.95
Parcel #
153-011-06-000
State Highways
I-5, S. Coast Highway
Railways
NCTD
Airports
None
Schools
Santa Margarita Elem.
Waterways
Loma Alta Creek, Pacific Ocean
Township
11S
Range
5W
Section
35
Base
SBM
Other Location Info
Between Oceanside Boulevard and Morse Street
Notice of Determination
Approving Agency
City of Oceanside
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
https://www.ci.oceanside.ca.us/gov/dev/planning/ceqa/coastal_rail_trail_south.asp
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.