Dogwood Timber Harvest Plan 1-15-042 SON “Dogwood” (Lake or Streambed Alteration Agreement No. 1600-2021-0012-R3)

Summary

SCH Number
2021060013
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Dogwood Timber Harvest Plan 1-15-042 SON “Dogwood” (Lake or Streambed Alteration Agreement No. 1600-2021-0012-R3)
Document Type
NOD - Notice of Determination
Received
Posted
6/1/2021
Document Description
The project is limited to installation of four temporary bridges, water drafting at four gravel bar water drafting sites and three off-site water holes, installation of a temporary pipe at three temporary skid trail watercourse crossings, installation of two temporary road watercourse crossings, installation of one temporary culvert, installation of one permanent culvert or rocked ford, and stabilization of one watercourse crossing.

Contact Information

Name
Julie Coombes, Environmental Scientist
Agency Name
CDFW
Contact Types
Responsible Agency

Location

Counties
Sonoma
Regions
Northern California, San Francisco Bay Area
Other Location Info
The project is located in Sonoma County, approximately 0.5 miles E of Gualala; Sections 4, 5, 6, 8, 15, 16, 17, 21, 22, 25, 26, 27, 30, 31, 33, and 35, Townships 10N and 11N, Ranges 14W and 15W, U.S. Geological Survey (USGS) maps Gualala 1977, Stewarts Point 1978, and McGuire Ridge 1991; Mt. Diablo base and meridian.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sonoma
Final Environmental Document Available at
Is available to the general public at the office location listed above for the Lead Agency. CDFW’s record of project approval as Responsible Agency is available at CDFW’s regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print