Gustafson Creek Bank Restoration
3 Documents in Project
Summary
SCH Number
2021050426
Lead Agency
Santa Clara County
Document Title
Gustafson Creek Bank Restoration
Document Type
NOD - Notice of Determination
Received
Posted
9/20/2021
Document Description
This application is for a Grading Abatement to restore the site to pre-graded conditions. This include removal of two retaining walls and a deck located along the top of bank of Stevens Creek (Wall A approximately 55 linear ft, and Wall B-2 approximately 7.5 linear ft), along with restoration of the creek banks with riparian vegetation. Two additional walls in close proximity to the creek are proposed to remain (Wall C approximately 9 linear ft., and Wall B-1 which does not impact the top of bank of the creek). Grading quantities are approximately 45 cubic yards of cut with a maximum depth of 2.5 ft.
Contact Information
Name
Colleen Tsuchimoto
Agency Name
Santa Clara County Planning Dept.
Contact Types
Lead/Public Agency
Phone
Name
Michael Gustafson
Agency Name
owner
Contact Types
Project Applicant
Phone
Email
Name
Robert Schneider
Agency Name
Delve Engineering Consulting
Contact Types
Parties Undertaking Project
Phone
Location
Cities
Los Altos
Counties
Santa Clara
Regions
Unincorporated
Cross Streets
Creston Drive
Zip
94024
Parcel #
326-12-057
Waterways
Stevens Creek
Notice of Determination
Approving Agency
Santa Clara County Planning Dept.
Approving Agency Role
Lead Agency
Approved On
County Clerk
Santa Clara
Final Environmental Document Available at
www.sccplandev.org under Previous Projects - Los Altos
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.