City of Dorris Wastewater Collection and Treatment Project

3 Documents in Project

Summary

SCH Number
2021050374
Lead Agency
City of Dorris
Document Title
City of Dorris Wastewater Collection and Treatment Project
Document Type
NOD - Notice of Determination
Received
Posted
7/21/2021
Document Description
The project includes improvements to the City’s wastewater collection system, Seattle Street Lift Station (LS), and Wastewater Treatment Plant (WWTP). Improvements include replacing sewer lines and installing pipe lining in existing sewer lines. The Seattle Street LS would be converted to a wet well and miscellaneous equipment would be upgraded and/or replaced. The force main between the LS and the WWTP would be replaced. Improvements at the WWTP include constructing a new headworks, an aeration basin and associated improvements, a separate disposal area in existing Pond 2, and a control/blower building. A SCADA system and emergency back-up generator would be installed. The existing access road from US 97 to the WWTP would be regraded and relocated within the City’s existing easement; an overhead power line to the WWTP would be installed immediately north of the road in a new utility easement. Underground electrical lines would be installed from the new electrical service to the new control/blower building. Groundwater monitoring wells would be installed around the WWTP. If funding allows, a photovoltaic solar system would be installed on the WWTP property south of the new aeration ponds.

Contact Information

Name
Melissa High
Agency Name
City Administrator
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project

Location

Cities
Dorris
Counties
Siskiyou
Cross Streets
Various
Zip
96023
Total Acres
52
State Highways
97
Railways
Union Pacific
Airports
None
Schools
Butte Valley Elementary and High Schools
Waterways
Indian Tom Lake
Township
48N
Range
1W
Base
MDM

Notice of Determination

Approving Agency
City of Dorris
Approving Agency Role
Lead Agency
Approved On
County Clerk
Siskiyou
Final Environmental Document Available at
Dorris City Hall, 307 S. Main Street, Dorris, CA 96023

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print