Cady Ranch Water Distribution Project

4 Documents in Project

Summary

SCH Number
2021050236
Lead Agency
Stockton East Water District
Document Title
Cady Ranch Water Distribution Project
Document Type
NOD - Notice of Determination
Received
Posted
12/2/2021
Document Description
Fowler Brothers Farming, Inc., in cooperation with the Stockton East Water District (District), is proposing to install a new surface water diversion in order to utilize surface water, instead of groundwater, for irrigation purposes on the Cady Ranch property. The Project will consist of two new pumps next to the Calaveras River, a new agricultural holding pond, and approximately 4,900 feet of 27” diameter PVC pipe for the surface water conveyance. The proposed project is located on farm property approximately 1 ¾ miles south of State Route 26 and approximately 7 miles northeast of the unincorporated community of Linden in San Joaquin County, California.

Contact Information

Name
Darrel Evensen
Agency Name
Stockton East Water District
Contact Types
Lead/Public Agency

Location

Cities
Stockton
Counties
San Joaquin
Regions
Northern California
Cross Streets
Sheldon Rd and Waverly Rd
Zip
95236
Total Acres
15
Parcel #
093-340-140, 093-320-060, 093-340-130
State Highways
HWY 26
Railways
N/A
Airports
N/A
Schools
N/A
Waterways
Calaveras River
Township
2N
Range
9E

Notice of Determination

Approving Agency
Stockton East Water District
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Joaquin
Final Environmental Document Available at
6767 East Main Street Stockton, CA 95215

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print