Mineral King Road Bridge (Historic Oak Grove Bridge) Replacement Project
4 Documents in Project
Summary
SCH Number
2021050226
Lead Agency
Tulare County
Document Title
Mineral King Road Bridge (Historic Oak Grove Bridge) Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
10/21/2021
Document Description
The Project includes the replacement of the Mineral King Road Bridge (Historic Oak Grove Bridge). The purpose of the Project is to construct a replacement bridge with a new cast-in-place tensioned concrete box girder on a new alignment, located immediately upstream ( east) of the existing bridge to preserve views from the approach roadway. In addition, three potential staging areas are being considered. The first construction staging area (West Construction Staging Area) is located immediately north of Mineral King Road, approximately 1.3 miles west of the existing bridge on APN 069-080-042 (which is owned by the United States Department of Interior, Bureau of Land Management). The second construction staging area (East Construction Staging Area) is located approximately 800 feet northeast of the existing bridge on APN 069-390-010 (which is privately owned). The third construction staging area (South Construction Staging Area) is located approximately 370 feet northeast of the existing bridge on APN 069-390-010 (which is privately owned).
Contact Information
Name
Hector Guerra
Agency Name
Tulare County Resource Management Agency
Contact Types
Lead/Public Agency / Project Applicant
Phone
Location
Cities
Three Rivers
Counties
Tulare
Regions
Unincorporated
Cross Streets
Mineral King Road
Parcel #
069-390-021, 069-390-010
Township
17S
Range
29E
Section
15
Other Location Info
6.5 miles east of State Route 198
Notice of Determination
Approving Agency
Tulare County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On
County Clerk
Tulare
Final Environmental Document Available at
Tulare County Resource Management Agency, 5961 S Mooney Blvd., Visalia CA 93277
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.