LP19-2035 Initial Study (Final)

3 Documents in Project

Summary

SCH Number
2021050208
Lead Agency
Contra Costa County
Document Title
LP19-2035 Initial Study (Final)
Document Type
FIN - Final Document
Received
Present Land Use
Primarily vacant with one approximately 3-foot-wide concrete drainage channel (V-Ditch)
Document Description
The applicant seeks approval of a Land Use Permit to allow the construction of a new self-storage facility with seven buildings consisting of one-, two-, and three-story building elements, 64,090 square feet of building footprint area, and 80,539 square feet of floor area on an approximately 7.75-acre lot. The project also consists of a request for approval of a lot line adjustment to merge the three parcels that comprise the project site. Development of the buildings and other improvements will occur wholly within the approximately 4.59-acre area of the subject property designated in the County General Plan for Light Industrial (LI) uses. Access to the facility will be through a new driveway from the existing edge of pavement of Evora Road. No code-protected trees will be altered or removed as part of the project. The project consists of the following elements: • Seven self-storage buildings o Building A: 5,184 square-foot, one-story building, with an office and 24 storage units, o Building B: 4,782square-foot, one-story building with 21 storage units, o Building C: 15,404 square-foot, two-story building with 114 storage units, o Building D: 10,432 square-foot, one-story building with 87 storage units, o Building E: 14,164 square-foot, one-story building with 91 storage units, o Building F: 22,944 square-foot, three-story building with 166 storage units, o Building G: 8,027 square-foot, one-story building with 43 storage units; • One 130-square-foot wall sign installed on Building A facing Evora Road; • Two bio-retention basins and fourteen flow-through planters for drainage; • Four off-street parking spaces, including one ADA-compliant space, adjacent to the office in Building A; • Interior driveways for access and loading at each building; • Sidewalk, curb, roadway, and gutter improvements along the southern edge of Evora Road extending from the existing crosswalk and intersection at Mota Drive to the eastern boundary of the project site; • Lighting installed on buildings for security; • Grading resulting in the export of ±2,200 cubic yards of cut; • Contra Costa Local Agency Formation Commission (LAFCO) approval of an amendment to Delta Diablo’s Sphere of Influence (SOI), and annexations to Contra Costa Water District (CCWD) and Delta Diablo service areas, for the extension of water and sewer services to the project. The proposed operating hours of the storage facility are: • Office Hours: Monday through Friday 9:00 A.M. to 6:00 P.M Saturday & Sunday 10:00 AM to 5:00 P.M. • Access Hours: Daily 7:00 A.M. and 9:00 P.M. Customers would be provided with a gate code for access at-will during access hours. In addition to the proposed project elements, the project proponent has identified an area of the property to be offered for potential use as public trail access to the Delta De Anza Regional Trail which runs adjacent to the subject property. The offered trail area and potential future trail connection are related to development of The Bay Church located west of the subject property (County File #CDDP91-03001) and is not related to nor required for this storage facility. Therefore, development of the trail area is not analyzed as part of the proposed project.

Contact Information

Name
Syd Sotoodeh
Agency Name
Contra Costa County, Dept. of Conservation and Development
Contact Types
Lead/Public Agency

Location

Cities
Unincorporated Bay Point
Counties
Contra Costa
Regions
Countywide, Unincorporated
Cross Streets
Evora Road and Mota Drive
Zip
94520
Total Acres
7.75
Jobs
2
Parcel #
098-220-015, 098-220-018, and 098-220-019
State Highways
SR 4
Railways
Union Pacific, Burlington Northe
Airports
n/a
Schools
Bay Christian School, Rio Vista Elementary, Gateway High School
Waterways
Unknown stream/watercourse, Contra Costa Canal, Mt. Diablo Creek

Notice of Completion

State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Transportation, District 4 (DOT), California Department of Water Resources (DWR), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), California State Lands Commission (SLC), Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Division of Water Rights
Development Types
Commercial (Self-Storage Facility)(Sq. Ft. 80539, Acres 4.59, Employees 2)
Local Actions
Use Permit
Project Issues
Aesthetics, Air Quality, Biological Resources, Cultural Resources, Geology/Soils, Noise

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print