Mission Springs Water District Vista Reservoir No. 2 Project

2 Documents in Project

Summary

SCH Number
2021050019
Lead Agency
Mission Springs Water District
Document Title
Mission Springs Water District Vista Reservoir No. 2 Project
Document Type
NOD - Notice of Determination
Received
Posted
9/23/2021
Document Description
Mission Springs Water District (MSWD or District) is proposing to develop a second reservoir at the exiting Vista Reservoir site. The existing Vista Reservoir site is approximately 1.23 acres. The proposed Vista Reservoir No. 2 Project includes a new 300,000-gallon reservoir approximately 30 feet northwest of the existing reservoir. Ultimately the installation of the new 300,000-gallon reservoir at the Vista Reservoir site will require installation of the following: retaining walls and hillside slope stabilization, stormwater management BMPs, installation of a new access road, relocation of the existing hydropneumatic station and the electrical cabinet, grading, wrought iron and chain link fence, and a new 300,000-gallon welded steel water storage reservoir and related piping. Design and construction of the Project is anticipated to be completed in approximately 6 months. Construction is anticipated to start in the third quarter of 2021.

Contact Information

Name
Danny Friend
Agency Name
Mission Springs Water District
Contact Types
Lead/Public Agency

Location

Counties
Riverside
Cross Streets
Valencia Drive and Puesta Del Sol
Zip
92240
Total Acres
1.23
State Highways
I-10
Waterways
Whitewater River
Township
2S
Range
5E
Section
19
Base
SBBM

Notice of Determination

Approving Agency
Mission Springs Water District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Riverside
Final Environmental Document Available at
MSWD 66575 Second Street, Desert Hot Springs, CA 92240

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print