Kibbe Road/State Route 20 Intersection Improvements Project

5 Documents in Project

Summary

SCH Number
2021040495
Lead Agency
Yuba County
Document Title
Kibbe Road/State Route 20 Intersection Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
4/10/2023
Document Description
The 9.5-acre Project will construct a private haul road to connect the Permittee's Hallwood Plant in Marysville directly to SR20, west of its existing intersection with Kibbe Road. The Project will also include the westerly realignment of approximately 600 feet of Kibbe Road, north of SR 20, to connect with the relocated intersection and account for distance that will be created between the existing roadway and the proposed intersection. The proposed roadway and intersection improvements include a left turn pocket for westbound SR 20 traffic, installing 12-foot shoulders on both sides of SR 20 west of the proposed intersection, and additional improvements to SR 20 as determined by Caltrans.

Contact Information

Name
Jenna Yang
Agency Name
Central Valley Regional Water Quality Control Board
Job Title
Water Resource Control Engineer
Contact Types
Responsible Agency

Location

Cities
Marysville
Counties
Yuba
Regions
Countywide
Cross Streets
intersection of Kibbe Road and State Route 20
Zip
95901

Notice of Determination

Approving Agency
Central Valley Regional Water Quality Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Yuba
Final Environmental Document Available at
https://ceqanet.opr.ca.gov/2021040495/3

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print