Markleeville Water System Improvements Project

2 Documents in Project

Summary

SCH Number
2021040480
Lead Agency
State Water Resources Control Board, Divison of Financial Assistance
Document Title
Markleeville Water System Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
6/5/2023
Document Description
The Project will replace existing pipelines (within public rights-of-way) most vulnerable to failure, reducing lifetime operation and maintenance costs associated with pipeline repair; implement hydraulic improvements, achieving improvements to available fire flows and increased turnover of the Pleasant Valley water storage tank; increase system reliability by placing the Pleasant Valley Tank feed pumps at the Water Treatment Plant (WTP), where a standby generator can provide power during a utility outage; and provide two tiers of disinfection byproduct control approaches: source control at the WTP and mixing and ventilation at the Pleasant Valley Tank.

Contact Information

Name
Kristal Kuo
Agency Name
State Water Resources Control Board-Division of Financial Assistance
Job Title
Environmental Scientist
Contact Types
Lead/Public Agency

Location

Counties
Alpine
Regions
Northern California
Cross Streets
State Route 89 and Hot Springs Road

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print