Scripps Mercy Hospital Campus
4 Documents in Project
Summary
SCH Number
2021040374
Lead Agency
City of San Diego
Document Title
Scripps Mercy Hospital Campus
Document Type
NOD - Notice of Determination
Received
Posted
2/8/2024
Document Description
Project Description: A CONDITIONAL USE PERMIT {CUP) to amend existing CUP No. 304755, SITEDEVELOPMENT PERMIT (SDP) to amend existing SDP No. 531932, a NEIGHBORHOOD USE PERMIT(NUP) for a COMPREHENSIVE SIGN PLAN, a TENTATIVE MAP {TM) to adjust property lines, PUBLICUTILITY EASEMENT VACATION, PUBLIC STREET VACATION, and a PLANNED DEVELOPMENT PERMIT(PDP) for demolition and construction on the Scripps Mercy Hospital Campus site. Demolition would Include the Facility Building, Generator Building and Cooling Tower, Behavioral Health Clinic, Hospital Building, 550 Washington Building, 550 Washington Parking Structure, Mercy Manor,
Parking Lot 4.1, Emergency Department, and Boiler and Laundry Building. Construction for the project would include Hospital I (15 stories, approximately 631,590 square feet), Hospital II (15 stories, approximately 380,000 square feet), Hospital Support Building (three stories with three levels of parking below ground, approximately 67,000 square feet), Medical Office Building {seven stories with two levels of subterranean parking and three levels of above ground parking,
approximately 200,000 square feet), Ambulance Drop-off Area, Loading Dock Area, Central EnergyPlant Expansion {approximately 2,400 square feet), and Utility Yards (totaling approximately 18,500square.feet). The Cancer Center and associated parking structure, currently under construction, would remain, as well as the College Building, Mercy Gardens, the Chapel, Central Energy Plant, Parking Lot 12, and Generator Building and Cooling Tower. A new parking structure {6'h Avenue
Parking Structure and Pedestrian Bridge) has been previously approved and would be constructed at the surface parking located on the east side of Sixth Avenue separately and In advance of major construction efforts of the project. The 21.07-acre site Is in the CC-3-8, CC-3-9, RM-3-9, OC-H, and OR-1-1 zones; Community Plan Implementation Overlay Zone-A; Airport Influence Area {San Diego
International Airport); FAA Part 77 Review Area; Parking Standards Transit Priority Area; Transit Area Overlay Zone; and Transit Priority Area within the Uptown Community Plan Area.
Contact Information
Name
Jeff Szymanski
Agency Name
City of San Diego
Job Title
Senior Planner
Contact Types
Lead/Public Agency
Phone
Email
Location
Cities
San Diego
Counties
San Diego
Regions
Citywide, Countywide
Cross Streets
Washington Street and 6th Avenue
Zip
92105
Total Acres
21
Parcel #
44-56-0340
Airports
San Diego International Airport
Schools
Florence Elementary School
Waterways
Pacific Ocean
Township
17
Range
4 West
Notice of Determination
Approving Agency
City of San Diego
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
Development Services Department, 1222 First Avenue, MS-501, San Diego, CA 92101
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.