Addendum for Expansion of Distribution System Pipelines into GWSA - Frick Unit Pipeline
3 Documents in Project
Summary
SCH Number
2021040213
Lead Agency
Arvin-Edison Water Storage District
Document Title
Addendum for Expansion of Distribution System Pipelines into GWSA - Frick Unit Pipeline
Document Type
NOD - Notice of Determination
Received
Posted
10/9/2024
Document Description
The Project would amend the adopted 2021 MND for the minor increase in pipeline length. The Addendum discusses the potential impacts as a result of an increase in the amount of pipeline length of the original approved design from 44 miles up to approximately 45.25 miles. The total pipeline length would involve adding 1 .25 net miles of pipeline and relocation of 1.0 mile of pipeline from the original design.
Contact Information
Name
Jeevan Muhar
Agency Name
Arvin-Edison Water Storage District
Job Title
General Manager
Contact Types
Lead/Public Agency
Phone
Email
Location
Cities
Arvin, Lamont
Counties
Kern
Regions
Southern California
Other Location Info
The proposed Project is located in central Kern County, California to the east of Lamont and to the northwest of Arvin. The proposed Project is an addendum to an MND that was adopted in 2021. The proposed Project is located in the northwest area of the original MND’s identified project area which is identified as the Frick Unit pipeline.
The proposed Project is within the United States Geological Survey (USGS) 7.5-minute quadrangle of Lamont. The Project area is situated north of Mountain View Road, east of Weedpatch Highway, west of Edison Drive, and south of Wilson Drive.
Notice of Determination
Approving Agency
Arvin-Edison Water Storage District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Kern
Final Environmental Document Available at
Arvin-Edison Water Storage District Office, 20401 E Bear Mountain Boulevard, Arvin, CA 93203
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.