Expansion of District Distribution System Pipelines into Groundwater Service Area Lands

2 Documents in Project

Summary

SCH Number
2021040213
Lead Agency
Arvin-Edison Water Storage District
Document Title
Expansion of District Distribution System Pipelines into Groundwater Service Area Lands
Document Type
NOD - Notice of Determination
Received
Posted
8/18/2022
Document Description
The proposed Project is for the construction of up to 44 miles of pipelines, manholes and turnouts within AEWSD. Assuming a maximum of 50’ width for possible ground disturbance along the proposed pipeline construction, the Area of Potential Effect (APE) is approximately 267-acres. The Project goal is to deliver wet-period surface water to landowners who would otherwise pump groundwater in the portions of the GWSA. The proposed pipelines will be operated when excess surface water is available (approximately every three years) and/or when water transfers are scheduled. The proposed pipelines will be mainly low-head gravity distribution pipelines ranging from 12” to 72” in diameter. The largest pipe sizes would be proportionally short distances near the heads of the branching gravity pipeline networks serving the various private agricultural fields and orchards in the APE. The proposed pipeline sizes and capacities will vary depending upon the number of acres served. Pipeline sizing will follow the conservative value of approximately eight gallons per minute per acre and/or the AEWSD Lateral Demand Sizing Criteria. The proposed pipelines will commence from various existing AEWSD facilities, such as the Forrest Frick Discharge Pipeline, North Canal, South Canal, or other smaller lateral pipelines. A 0.75-mile open canal is also proposed from the existing Tejon Spreading Works.

Contact Information

Name
Jeevan Muhar, Engineer-Manager
Agency Name
Arvin-Edison Water Storage District
Job Title
Engineer-Manager
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project

Location

Cities
Arvin
Counties
Kern
Regions
Countywide
Cross Streets
NA
State Highways
184
Airports
Creekside Water Ski Community
Waterways
North Canal and South Canal and East Canal
Base
MDB&M
Other Location Info
The Project site encompasses a lot of AEWSD's boundary and extends approximately 16 miles north/south and is surrounded by agricultural lands, most of which is currently in production. To the South is David Road, North is Muller Road. East is Camanche Drive. West is Highway 184. The town of Arvin sits in the middle with Lamont to the West.

Notice of Determination

Approving Agency
Arvin-Edison Water Storage District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Kern
Final Environmental Document Available at
State Clearinghouse Web Portal

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print