Streambed Alteration Agreement No. 1600-2020-0416-R1 for Timber Harvesting Plan (THP) 1-20-00131-HUM “ABC Tree Farm”

Summary

SCH Number
2021040195
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Streambed Alteration Agreement No. 1600-2020-0416-R1 for Timber Harvesting Plan (THP) 1-20-00131-HUM “ABC Tree Farm”
Document Type
NOD - Notice of Determination
Received
Posted
4/7/2021

Document Description
The Department of Fish and Wildlife (CDFW) is issuing a permit to install and remove three Class III temporary crossings and utilize one Class II gravity fed water drafting site.

Contact Information
Nicholas Simpson
Department of Fish and Wildlife
Responsible Agency
601 Locust Street
Redding, CA 96001

Phone : (707) 445-6512
nicholas.simpson@wildlife.ca.gov

Location

Counties
Humboldt
Regions
Northern California
Other Location Info
The project is located in Humboldt County on unnamed tributaries to Dry Creek, tributary to Bull Creek, tributary to the South Fork Eel River. The project is located in Sections 22 and 27, Township 2S, Range 01E; Humboldt Base and Meridian, in the Dry Creek, California, U.S. Geological Survey 7.5-minute quadrangle.

Notice of Determination

Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
The final EIR, Negative Declaration or THP/NTMP that was prepared by the Lead Agency for this project is available to the General Public at the office location listed above for the Lead Agency. CDFW’s CEQA Findings are available at the Eureka CDFW office located at 619 Second Street, Eureka, California, 95501.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Timber Harvesting Plan)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination
1600-2020-0416-R1_1-20-00131-HUM_ABCTreeFarmTHP_NOD   PDF 69 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print