Department of Water Resources Conveyance of up to 40,000 acre-feet of Non-SWP Water to Tulare Lake Basin Water Storage District (SWPAO #21004)
Summary
SCH Number
2021040167
Public Agency
Tulare Lake Basin Water Storage District
Document Title
Department of Water Resources Conveyance of up to 40,000 acre-feet of Non-SWP Water to Tulare Lake Basin Water Storage District (SWPAO #21004)
Document Type
NOE - Notice of Exemption
Received
Posted
4/7/2021
Document Description
The Department of Water Resources of the State of California (DWR) will convey up to 40,000 acre-feet of Central Valley Project (CVP) water (Non-Project Water) to Tulare Lake Basin Water Storage District (TLBWSD). This Non-Project Water consists of Friant Recirculation water from Lower Tule River Irrigation District (LTRID) and Orange Cove Irrigation District (OCID) and/or Cross Valley water from LTRID, Pixley Irrigation District (PID), and Hills Valley Irrigation District (HVID). The United States Bureau of Reclamation (Reclamation) will make the Non-Project Water available to DWR at O’Neill Forebay and/or Banks Pumping Plant for subsequent delivery by DWR to TLBWSD’s service area by February 28, 2022. If TLBWSD is unable to take full delivery of the Non-Project Water by February 28, 2022, DWR may store the remaining amount in its share of San Luis Reservoir, on TLBWSD’s behalf, for later delivery to TLBWSD’s service area by December 31, 2022. In exchange, TLBWSD will deliver a comparable amount of TLBWSD’s local river supplies to LTRID, OCID, PID, and HVID.
Contact Information
Name
Patrick Luzuriaga
Agency Name
SWP contracts chief
Contact Types
Responsible Agency
Phone
Location
Counties
Kings
Regions
Countywide
Other Location Info
From O’Neill Forebay, Banks Pumping Plant, and/or San Luis Reservoir to TLBWSD’s turnout(s) in Reaches 8C and 8D of the California Aqueduct
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
Class 1; CEQA Guidelines Section 15301, existing facility
Reasons for Exemption
a. The project is a water management operation using only existing facilities.
b. The project will not support new development or a change in land use.
c. The project does not establish a new permanent source of water supply.
d. State Water Project long-term water supply contract includes provisions for conveyance of non project water to SWP contractors.
County Clerk
Kings