Ventura-Santa Barbara Counties Intertie Project

3 Documents in Project

Summary

SCH Number
2021040036
Lead Agency
Casitas Municipal Water District
Document Title
Ventura-Santa Barbara Counties Intertie Project
Document Type
NOD - Notice of Determination
Received
Posted
3/29/2023
Document Description
The Ventura-Santa Barbara Counties Intertie Project (proposed project) involves the construction and operation of potable water infrastructure to connect the CMWD and Carpinteria Valley Water District (CVWD) water transmission systems. The proposed project includes between approximately 7,100 linear feet (LF; 1.3 miles) of 16-inch-diameter potable water pipeline, two booster pump stations, replacement of select portions of the existing Rincon Main Pipeline, and improvements to infrastructure at other existing CMWD facilities. The pipeline would traverse the boundary between Ventura and Santa Barbara counties and act as a two-way intertie to allow the transfer of water between CMWD and CVWD, as necessary. The project site traverses State Routes 192 and 150, both of which are under the jurisdiction of the California Department of Transportation.

Contact Information

Name
Julia Aranda
Agency Name
Casitas Municipal Water District
Job Title
Engineering Manager
Contact Types
Lead/Public Agency

Location

Counties
Santa Barbara, Ventura
Regions
Southern California
Cross Streets
SR 192/SR 150
Zip
93013
Total Acres
n/a
Parcel #
see NOI
State Highways
SR 192, SR 150
Railways
n/a
Airports
n/a
Schools
n/a
Waterways
Rincon Creek, Lake Casitas
Township
4N
Range
24W
Section
31

Notice of Determination

Approving Agency
Casitas Municipal Water District
Approving Agency Role
Lead Agency
Approved On
County Clerks
Santa Barbara, Ventura
Final Environmental Document Available at
https://www.casitaswater.org/about-us/engineering/engineering-reports-and-master-plans

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print