Initial Study Application No. 7589 - Dry Creek Bridge Replacement
Summary
- SCH Number
- 2021030649
- Lead Agency
- Fresno County
- Document Title
- Initial Study Application No. 7589 - Dry Creek Bridge Replacement
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 3/29/2021
- Document Description
- The subject application proposes to replace the Dry Creek Bridge on Burrough Valley Road that consists of removal of the existing structure and allow construction of a replacement structure measuring 34 feet, 1 O inches wide by 111 feet long and will accommodate two 12-foot wide traffic lanes, two 4-foot wide should and two Type 736 concrete barriers. The elevation of Burrough Valley Road and Tollhouse Road intersection will be raised to accommodate 100-year storm event. An existing box culvert on Tollhouse road north of Burrough Valley Road would also be removed and replaced and consist of a two cell 6-foot high by 12-foot wide precast concrete box culvert structure and will be buried approximately 2 feet in native creek bed soil to provide a natural creek bed through the structure.
- Contact Information
-
Thomas Kobayashi
County of Fresno
Lead/Public Agency
2220 Tulare Street Suite "A"
Fresno, CA 93721
Phone : (559) 600-4224
tkobayashi@fresnocountyca.gov -
Christian Montoya
County of Fresno
Project Applicant
2220 Tulare Street Suite 600
Fresno, CA 93721
Phone : (559) 600-0522
chmontoya@fresnocountyca.gov
Location
- Counties
- Fresno
- Other Location Info
- The project site is located on Burrough Valley Road, immediately east of its intersection with Tollhouse Road, in the unincorporated area of Fresno County.
Notice of Determination
- Approving Agency
- Fresno County Board of Supervisors
- Approving Agency Role
- Lead Agency
- Approved On
- County Clerk
- Fresno
- Final Environmental Document Available at
- 2220 Tulare Street, Suite A, Fresno, CA 93721
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Attachments
- Notice of Determination
- IS 7589 MND-NOD (FILED) PDF 164 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.