Water Main Extension Project

2 Documents in Project

Summary

SCH Number
2021030616
Lead Agency
Pixley Public Utility District
Document Title
Water Main Extension Project
Document Type
NOD - Notice of Determination
Received
Posted
5/12/2021
Document Description
Based upon a Feasibility Study prepared by Provost & Pritchard in August of 2020, the Project would consist of the following improvements: • A new 12-inch diameter pipeline crossing installed in a 24-inch diameter steel casing, in accordance with Caltrans Specifications under State Route 99 (SR 99), replacing an existing 4-inch pipeline crossing. Crossing will utilize jack & bore method. The existing 4-inch pipeline will be abandoned in place. • Interconnection of this new 12-inch undercrossing pipeline to existing distribution pipelines west of SR 99, at Main Street and East Court Avenue, utilizing open trench method. • A new 12-inch diameter water main installed east of SR 99 in North Park Drive replacing the existing 4-inch distribution line serving existing connections in the northeast area of Pixley. Installation will utilize open trench method. • Interconnection of the new 12-inch main east of SR 99 to existing pipelines serving the eastern area of Pixley, at North Park Drive and East Howard Avenue, utilizing open trench method. The interconnections of the new larger diameter crossing of State Route 99 would complete a “loop” which would allow for additional potable water supply reliability and reduce pressure issues which will benefit the water service.

Contact Information

Name
Roger Ward
Agency Name
Pixley Public Utility District, Board President
Contact Types
Lead/Public Agency / Project Applicant

Location

Counties
Tulare
Regions
Unincorporated
Cross Streets
SR99 at Main Street and East Court Ave
State Highways
SR99

Notice of Determination

Approving Agency
Pixley Public Utility District, Board President
Approving Agency Role
Lead Agency
Approved On
County Clerk
Tulare
Final Environmental Document Available at
Pixley Public Utility District, 232 East Davis Avenue, Pixley, CA 93256

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.