Wildomar MDP Lateral C Revision - Bundy Canyon Basin Project

4 Documents in Project

Summary

SCH Number
2021030570
Lead Agency
Riverside County Flood Control and Water Conservation
Document Title
Wildomar MDP Lateral C Revision - Bundy Canyon Basin Project
Document Type
NOD - Notice of Determination
Received
Posted
6/2/2022
Document Description
The purpose of the Project is to alleviate flood potential within the City of Wildomar by revising the original proposed Wildomar Master Drainage Plan (MDP) Lateral C facility. The Project will construct Phase I of the MDP Lateral C, Stage 3 facility. Stage 1, from Wildomar Channel to Palomar Street, was constructed in 1987, and Stage 2, from Palomar Street to Pasadena Street, was constructed in 1992. The Wildomar MDP Lateral C revision includes the following five components: Bundy Canyon Basin, Bundy Canyon Channel Lateral A Extension (Main Inlet Channel), Lateral C (Mainline Facility), Lateral C-2. and Lateral C-3. The Discharger proposes to construct and maintain Phase l of Stage 3 which includes the following two components: Bundy Canyon Basin and the extension of Lateral A (Main Inlet Channel) east of Interstate 15 (I-15).

Contact Information

Name
Darren Bradford
Agency Name
San Diego Water Board
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Temecula, Wildomar
Counties
Riverside
Regions
Southern California
Cross Streets
east of Monte Vista Drive, at the southeast corner of the Bundy Canyon Road-Monte Vista Drive in
Parcel #
367-110-007; 367-110-008; 367-472-001; 367-472-002

Notice of Determination

Approving Agency
San Diego Water Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Riverside
Final Environmental Document Available at
2375 Northside Drive, Ste. 100, San Diego CA 92108

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print