State Route 62/177 Road Rehabilitation/Asphalt Concrete Overlay Environmental Permit Information Management System (EPIMS)-SBR-21960-R6

3 Documents in Project

Summary

SCH Number
2021030403
Lead Agency
California Department of Transportation, District 8 (DOT)
Document Title
State Route 62/177 Road Rehabilitation/Asphalt Concrete Overlay Environmental Permit Information Management System (EPIMS)-SBR-21960-R6
Document Type
NOD - Notice of Determination
Received
Posted
12/16/2021
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number EPIMS-SBR-21960-R6 pursuant to section 1602 of the Fish and Game Code to the project Applicant, California Department of Transportation District 8. All 31 project locations consist of repairing, maintaining, and operating existing structures by pushing displaced native soil that is within the stream back into place up against the shoulder of existing paved apron to restore the original contours.

Contact Information

Name
Alisa Ellsworth
Agency Name
Fish and Wildlife, Region 6
Job Title
Environmental Program Manager I
Contact Types
Responsible Agency

Location

Counties
Riverside, San Bernardino
Regions
Southern California
Other Location Info
State Route 62/177 Road Rehabilitation/Asphalt Concrete Overlay, Riv-62 (PM 84.94/90.2), Riv-177 (PM 27.0/27.02), and SBR-62 (PM R90.2/R94.0).

Notice of Determination

Approving Agency
Fish and Wildlife, Region 6
Approving Agency Role
Responsible Agency
Approved On
County Clerks
Riverside, San Bernardino
Final Environmental Document Available at
California Department of Transportation D8 464 West 4th Street San Bernardino, CA 92401

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print