San Joaquin Marsh Reserve Water Conveyance and Drainage Improvement

2 Documents in Project

Summary

SCH Number
2021030295
Lead Agency
University of California, Irvine
Document Title
San Joaquin Marsh Reserve Water Conveyance and Drainage Improvement
Document Type
NOD - Notice of Determination
Received
Posted
5/18/2021

Document Description
The project would improve the long-term water management and habitat value of the UC San Joaquin Marsh Reserve (Marsh Reserve). The project proposes new and repair of existing hydrology and water quality infrastructure to better manage flows within the Marsh Reserve. Design Goal 1 proposes infrastructure establishment and/or modifications that anticipate impacts of climate change (e.g., drought, flooding, and sea level rise). Design Goal 2 focuses on water sourcing, treatment, and measurement. The Marsh Reserve would continue as a preservation area during and after construction.

Contact Information
Lindsey Hashimoto
University of California, Irvine
Lead/Public Agency
4199 Campus Dr, Suite 380
Irvine, CA 92697

Phone : (949) 824-8692
hashimol@uci.edu

Location

Cities
Irvine
Counties
Orange
Regions
Southern California
Cross Streets
The site is located west of the Campus Drive and University Drive intersection.

Notice of Determination

Approving Agency
University of California, Irvine
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
https://cpep.uci.edu/environmental/review.php , and University of California, Irvine, Office of Physical and Environmental Planning, 4199 Campus Drive, Suite 380, Irvine, CA 92697, Attn: Lindsey Hashimoto, Senior Planner.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
2021 Environmental Filing Fee Cash Receipt_DFG 753   PDF 328 K 21-05-17_SJMR_NOD_Signed   PDF 146 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print