Oroleve Ditch Line Project

Summary

SCH Number
2021030205
Public Agency
North Yuba Water District
Document Title
Oroleve Ditch Line Project
Document Type
NOE - Notice of Exemption
Received
Posted
3/9/2021
Document Description
The project involves an existing facility that is used to deliver water to the Forbestown Treatment Plant where it is treated and utilized as drinking water by residents within the water district's service area. Additionally. the project involves the replacement of an existing utility system with one that involves negligible or no expansion of capacity. The piping of the Oroleve Ditch will not expand the existing capacity of the ditch, it will instead reduce water loss from the existing open channel. The project involves the placement of a 36-inch HOPE pipe within the existing ditch alignment and will serve the same purpose as the existing ditch. The existing ditch moves water from the Oroleve Ditch headworks located on Oroleve Creek to the Forbestown Ditch at the Oroleve Siphon, the new piped ditch will serve the exact same purpose.

Contact Information

Name
Leona Harris
Agency Name
Submitter
Contact Types
Lead/Public Agency

Location

Cities
Forbestown
Cross Streets
La Porte Rd
Waterways
Oroleve Creek

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301(b) , 15302(c)
Reasons for Exemption
Existing facility
County Clerk
Yuba

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print