Permit No. 19668 – Sump Station Facilities Improvement Project Sumps 102 and 58
7 Documents in Project
Summary
SCH Number
2021030186
Lead Agency
City of Sacramento
Document Title
Permit No. 19668 – Sump Station Facilities Improvement Project Sumps 102 and 58
Document Type
NOD - Notice of Determination
Received
Posted
3/5/2024
Document Description
Approval of Permit No. 19668, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To install two flights of concrete stairs 5 feet wide by 14.6 feet long, and 5 feet by 14.5 feet long along the waterside slope of the right (north) bank levee of the American River. The top and bottom elevation of the stairs will be at 39.69 feet and 25.89 feet (NAVD 88), respectively.
Contact Information
Name
Angela Nguyen-Tan
Agency Name
Central Valley Flood Protection Board
Job Title
Senior Environmental Scientist
Contact Types
Responsible Agency
Phone
Location
Cities
Sacramento
Counties
Sacramento
Regions
Northern California
Other Location Info
The project is located at the City of Sacramento's Sump 58, on the waterside of the right (north) bank levee of the American River, approximately 0.9 miles upstream of the Interstate 5 bridge across the American River, in Sacramento County.
Notice of Determination
Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
The Mitigated Negative Declaration, prepared by the lead agency for the project, is available to the general public at the lead agency’s office listed above. The Board’s administrative record related to the encroachment permit is available for public review at the Board’s office. Please note, the signed NOD is not attached. If you would like to request a signed copy of the NOD, please contact Board staff at: questions@cvflood.ca.gov.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.