Bear River Setback Levee Project (Lake and Streambed Alteration Agreement EPIMS Notification No. SUT-17194-R2)

5 Documents in Project

Summary

SCH Number
2021020437
Lead Agency
Reclamation District 817 (RD817)
Document Title
Bear River Setback Levee Project (Lake and Streambed Alteration Agreement EPIMS Notification No. SUT-17194-R2)
Document Type
NOD - Notice of Determination
Received
Posted
10/14/2021
Document Description
The project consists of the construction of approximately 2,800 feet of new setback levee and buttress on the north bank of the Bear River near the City of Wheatland, California. The portion of existing levee where the setback levee will be constructed will be degraded, and the degrade material will be used to buttress an approximately 8,500-footlong portion of existing levee downstream of the new setback levee. Material for the setback levee will be borrowed and hauled from a nearby agricultural site located adjacent to and south of Grasshopper Slough.

Contact Information

Name
Gabriele Quillman
Agency Name
California Department of Fish and Wildlife
Contact Types
Responsible Agency

Location

Counties
Sutter
Regions
Northern California
Parcel #
28-210-02
Other Location Info
north bank of the Bear River on Federal Levee RD 0817
Other Information
Carlin – Unit 2, Segment ID 5304000872

Notice of Determination

Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sutter
Final Environmental Document Available at
office location listed above for the Lead Agency. CDFW’s record of execution of the above Lake and Streambed Alteration Agreement as Responsible Agency is available at CDFW’s regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print