Arana Sewer Trunk Line Replacement Project

3 Documents in Project

Summary

SCH Number
2021020301
Lead Agency
Santa Cruz County
Document Title
Arana Sewer Trunk Line Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
6/17/2021
Document Description
The project involves replacement of approximately 2,900 linear feet of aging and deteriorated existing sewer trunk line and associated manholes. The project will replace 13 sewer line segments, which occur in between existing manholes. These segments are part of the trunk line that conveys wastewater to the City of Santa Cruz wastewater treatment plant. The replacement pipes would be installed using trenchless methods (pipe-bursting) where possible and conventional (open cut) trenching methods with excavators and loaders where trenchless methods cannot be used. Installation of Segment 6 under Highway 1 will utilize either a bore-and-jack technique or micro-tunneling.

Contact Information

Name
Matt Johnston
Agency Name
Environmental Coordinator
Contact Types
Lead/Public Agency

Location

Counties
Santa Cruz
Regions
Unincorporated
Cross Streets
Soquel Avenue at La Fonda Avenue
Zip
95060
Total Acres
19.7
Jobs
1
Parcel #
Various
State Highways
Highway 1
Railways
N/A
Airports
N/A
Schools
N/A
Waterways
Arana Gulch
Township
Santa

Notice of Determination

Approving Agency
Santa Cruz County Sanitation District Board of Directors
Approving Agency Role
Lead Agency
Approved On
County Clerk
Santa Cruz
Final Environmental Document Available at
https://www.sccoplanning.com/PlanningHome/Environmental/CEQAInitialStudiesEIRs/ArchivedCEQADocuments.aspx

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print