Cascade Canyon Trail Bridge Project (Lake or Streambed Alteration Agreement No. EPIMS-MAN- 52367-R3)

5 Documents in Project

Summary

SCH Number
2021020230
Lead Agency
Marin County Open Space District (MCOSD)
Document Title
Cascade Canyon Trail Bridge Project (Lake or Streambed Alteration Agreement No. EPIMS-MAN- 52367-R3)
Document Type
NOD - Notice of Determination
Received
Posted
3/17/2025
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-MAN-52367-R3), pursuant to Fish and Game Code section 1602, to the project Applicant, County of Marin. The Project is limited to construction of two bridges and minor grading of two ford crossings. The construction of Bridge 1 at Location 1 includes a 90 foot-long, 6-foot wide bridge and the construction of Bridge 2 at Location 2 includes a 60-foot long, 6-foot wide bridge; both bridges constructed above 100-year flood elevation. Both bridges are prefabricated weathered steel connector style truss bridges with reclaimed redwood decking. The bridges will be constructed offsite in segments, then assembled at the Project site, respectively. The concrete bridge footings for each bridge will be located outside of the top of the stream bank. There will be no piers for Bridge 1 or 2 in the channel. The existing rock slope protection (RSP) on the north side of the stream at Bridge 1 and the south side of the stream at Bridge 2 will be repaired as needed to provide the required bridge abutment protection. Additionally, 40 cubic yards of new RSP will be placed at each bridge location, totaling 80 cubic yards of new RSP. At Location 1 One 8-inch diameter at breast height (DBH) madrone (Arbutus menziesii) will be removed, and there will be thinning and removal of some brush vegetation. At Location 2 there will be no vegetation removal. Large equipment (excavator, trucks, compactor, etc.) will temporarily ford the stream during the dry season to access the bridge sites. Tree roots may be impacted during the excavation of the bridge footings for some of the larger trees. Minimal excavation will be employed to avoid any unnecessary impacts to tree roots. No water will be present during construction. There will be minor grading and temporary fill placement at existing rock ford crossings 2 and 3, ford crossing 2 is located upstream of Bridge 1 and ford crossing 3 is located downstream of Bridge 2, to reduce the approach angle of construction equipment access. Temporary fill will be sourced from onsite excavations or from a CDFW approved location. Temporary fill will be placed on top of CDFW approved erosion control fabric to avoid mixing with the native and existing channel bed material. At the conclusion of project implementation, an excavator will remove the temporary fill, which will be spread on-site in upland areas at a CDFW approved location, and erosion control measures would be applied. The erosion control fabric will be disposed of at an approved landfill. The bridge and RSP permanent impacts at Location 1 total 776 square feet (0.018 acre) and the vegetation permanent impacts total 776 square feet (0.018 acre). The bridge and RSP permanent impacts at Location 2 total 356 square feet. There are no temporary impacts from the bridge work. The combined permanent impacts at Locations 1 and 2 total 1,908 square feet (0.044 acre). The ford crossing will result in temporary impacts from minor grading totaling 750 square feet (0.018 acre) including temporary fill of 25 cubic yards for both rock ford crossings 2 and 3.

Contact Information

Name
Jordan Beaton
Agency Name
CA Dept of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Name
Michelle Julene
Agency Name
Marin County Open Space District
Job Title
Lead Agency Contact
Contact Types
Lead/Public Agency

Location

Cities
Unincorporated Fairfax
Counties
Marin
Regions
San Francisco Bay Area
Waterways
San Anselmo Creek
Other Location Info
The Project is located at San Anselmo Creek at two locations 1) Latitude 37.978111, Longitude -122.61474, and 2) Latitude 37.979783, Longitude -122.61720, in the County of Marin, State of California.

Notice of Determination

Approving Agency
CA Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Marin
Final Environmental Document Available at
The Mitigated Negative Declaration prepared for the project is available to the general public at the office location listed above for the Lead Agency. CDFW’s record of project approval as a Responsible Agency is available at CDFW’s regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print