San Francisquito Creek Bank Stabilization Project, Phase II (Lake or Streambed Alteration Agreement No. 1600-2020-0198-R3)
3 Documents in Project
Summary
SCH Number
2021020108
Lead Agency
City of Palo Alto
Document Title
San Francisquito Creek Bank Stabilization Project, Phase II (Lake or Streambed Alteration Agreement No. 1600-2020-0198-R3)
Document Type
NOD - Notice of Determination
Received
Posted
6/1/2021
Document Description
The Project is limited to bank stabilization along 275 linear feet of the eastern bank of San Francisquito Creek. At the bank toe, 550 cubic yards of boulders and base rock will be installed. There will be 13 rootwads installed at existing pools for fish habitat. Above the boulders and rootwads, a Lincoln-log style crib wall will be installed, consisting of 163 cubic feet of either Douglas fir, coast redwood, or other native riparian tree trunks. The cribwall will be planted with willows, and trees and shrubs will be planted above the cribwall at, and just beyond, top of bank.
Contact Information
Name
Kristin Garrison, Environmental Scientist
Agency Name
CDFW
Contact Types
Responsible Agency
Phone
Location
Cities
Palo Alto
Counties
Santa Clara
Regions
Northern California, San Francisco Bay Area
Other Location Info
The Project is located at 650 Clark Way, Palo Alto, Santa Clara County, California, CA 94304. The coordinates are 37.440691° N latitude and 122.179399° W longitude (NAD 83 or WGS 84). The Assessor’s Parcel Number is 142-02-020.
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Santa Clara
Final Environmental Document Available at
Is available to the general public at the office location listed above for the Lead Agency. CDFW’s record of project approval as Responsible Agency is available at CDFW’s regional office.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.