San Jose Data Center

3 Documents in Project

Summary

SCH Number
2021020002
Lead Agency
California Energy Commission
Document Title
San Jose Data Center
Document Type
NOD - Notice of Determination
Received
Posted
7/18/2022
Document Description
Microsoft Corporation (Microsoft or applicant) was granted a Small Power Plant Exemption (SPPE) from the California Energy Commission’s (CEC) jurisdiction to proceed with local approval rather than requiring certification by the CEC for the San Jose Data Center (SJDC or project). Project Description: The applicant proposes to construct and operate a 396,914 square foot data center, located at 1657 Alviso-Milpitas Road in San Jose, California near an existing power plant and wastewater treatment facility. The project would consist of two single-story data center buildings. To provide reliable operation of the project in the event of loss of electrical service from the local electric utility provider, Pacific Gas and Electric Company (PG&E), the project includes 224 renewable natural gas (natural gas) generators each rated at 0.45 MW output capacity to provide electrical power to support the data center uses during utility outages, certain onsite electrical equipment interruptions or failure, and for load shedding, demand response and behind-the-meter resource adequacy ancillary services. The maximum electrical load of the project would be 99 MW, although the estimated load is 77 MW, inclusive of information technology (IT) equipment, ancillary electrical/ telecommunications equipment, and other electrical loads (administrative, heat rejection, and safety/ security). In addition, the project includes two Tier 4 diesel-powered generators (designated as administrative generators), with a 1.25 MW standby generator for the northern building and a 0.5 MW standby generator for the southern building. The project also includes an onsite 115 kilovolt (kV) substation located in the northwestern corner of the project site with two 115 kV underground electrical supply lines (approximately 0.2 mile) that would connect to PG&E’s Los Esteros Substation, located adjacent to the site. The project would require offsite linears for potable water, reclaimed water, stormwater, sanitary sewer, natural gas, and electrical.

Contact Information

Name
Lisa Worrall
Agency Name
California Energy Commission
Job Title
Senior Environmental Planner
Contact Types
Lead/Public Agency

Location

Cities
San Jose
Counties
Santa Clara
Regions
Citywide
Cross Streets
Alviso-Milpitas Rd/Ranch Rd/Mc Carthy Blvd
Zip
95119
Total Acres
64.5
Jobs
100
Parcel #
015-31-054
State Highways
SR-237, 1-880
Railways
VTA, UP
Airports
None
Schools
Anthony Spangler Elementary, Don Callejon, Pearl Zanker Elem
Waterways
Berryessa Creek, Calera Creek, Coyote Creek, Guadalupe River, Los Coches Creek, Lower Penitencia

Notice of Determination

Approving Agency
California Energy Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print