Sutter Slough Critical Erosion Repairs Flood System Repair Project

2 Documents in Project

Summary

SCH Number
2021010273
Lead Agency
Reclamation District 999 (RD999)
Document Title
Sutter Slough Critical Erosion Repairs Flood System Repair Project
Document Type
NOD - Notice of Determination
Received
Posted
5/11/2021
Document Description
In January 2020, MBK Engineers (MBK), on behalf of the District, identified seven erosion sites along Sutter Slough based on observations from site reconnaissance, geometric analysis from a land survey of the levee, and a bank and bathymetric survey of the channel. MBK prioritized repairs based on a qualitative assessment of slope verticality, channel depth at waterside toe, levee geometry, channel meander, vegetated cover, and constructability. The project would address bank loss, toe scour, and erosion by flattening the waterside levee slope and placing approximately 18- to 24-inch riprap to reestablish the bank slope and channel

Contact Information

Name
Tina Anderson
Agency Name
MBK Engineers
Contact Types
Parties Undertaking Project

Name
Thomas J. Slater
Agency Name
Reclamation District 999
Contact Types
Lead/Public Agency

Location

Counties
Solano, Yolo
Regions
Countywide
Cross Streets
Holland Road and Road 145
State Highways
84 and 160
Railways
None
Airports
None
Schools
River Delta and Bates Elementary
Waterways
Sutter Slough, Sacramento River, Miner Slough, Steamboat Slough

Notice of Determination

Approving Agency
Reclamation District 999
Approving Agency Role
Lead Agency
Approved On
County Clerks
Solano, Yolo
Final Environmental Document Available at
38563 Netherlands Road Clarksburg, CA 95612 or RD 999 website at http://rd999.org/resources/

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.