Bellefield Solar Project by 50LW 8ME (8Minute Energy)

7 Documents in Project

Summary

SCH Number
2021010168
Lead Agency
Kern County
Document Title
Bellefield Solar Project by 50LW 8ME (8Minute Energy)
Document Type
NOD - Notice of Determination
Received
Posted
2/25/2022
Document Description
Proposed photovoltaic solar facility and energy storage system capable of producing up to 1,500 megawatt (MW) alternating current (AC) utility-scale solar power with an up to 1,500 MW-hour (MWh) energy storage capacity on approximately 8,371 acres of privately-owned land. The proposed project would be supported by a 230 kilovolt (kV) overhead and/or underground electrical transmission line(s) originating from one or more on-site substation(s)/ switchyard(s) and terminating at the Southern California Edison (SCE) Windhub Substation.

Contact Information

Name
Cynthia Herzog
Agency Name
California State Lands Commission
Job Title
Senior Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Mojave
Counties
Kern
Regions
Southern California
Other Location Info
A strip of land 100 feet in width containing approximately 6.49 acres located in a portion of Section 18, Township 11 North, Range 12 West, SBM, west of Mojave, Kern County.

Notice of Determination

Approving Agency
California State Lands Commission
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Kern
Final Environmental Document Available at
CSLC, 100 Howe Avenue, Suite 100-South Sacramento, CA 95825-8202

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print