Bellefield Solar Project by 50LW 8ME (8Minute Energy) Response to Comments

7 Documents in Project

Summary

SCH Number
2021010168
Lead Agency
Kern County
Document Title
Bellefield Solar Project by 50LW 8ME (8Minute Energy) Response to Comments
Document Type
RC - Response to Comments
Received
Present Land Use
Undeveloped Land/Kern County General Plan: 1.1 (State and Federal Land); 8.5 (Resource Management, Min. 20 Acre Parcel Size); and 8.5/2.5 (Resource Management, Min. 20 Acre Parcel Size/Flood Hazard). Undeveloped Land/Mojave Specific Plan:7.1 (7.1 – Light Industrial); and 7.3 (7.3 – Heavy Industrial). Kern County Zoning: A (Exclusive Agriculture); A-1 (Limited Agriculture); A-1 MH (Limited Agriculture Mobilehome Combining District); M-2 PD (Medium Industrial Precise Development Combining District); and M-3 PD (Heavy Industrial Precise Development Combining District). Undeveloped Land/California City General Plan: O/RA – Controlled Development & Open Space. Undeveloped Land/California City Zoning: O/RA (Open Space/Residential/Agricultural).
Document Description
The Bellefield Solar Project by 50LW 8ME LLC (8Minute Energy - project proponent), is a proposed photovoltaic solar facility and energy storage system capable of producing up to 1,500 megawatt (MW) alternating current (AC) utility-scale solar power with an up to 1,500 MW-hour (MWh) energy storage capacity on approximately 8,371 acres of privately-owned land. The proposed project would be supported by a 230 kilovolt (kV) overhead and/or underground electrical transmission line(s) originating from one or more on-site substation(s)/switchyard(s) and terminating at the Southern California Edison (SCE) Windhub Substation. The proposed project’s permanent facilities would include service roads, a power collection system, communication cables, overhead and underground transmission lines, electrical switchyards, project substations, energy storage system(s), and operations and maintenance (O&M) facilities. The project proponent is requesting the following: Kern County (Lead Agency): a) GPA #2, Map 195 from the existing Map Code 1.1 (State or Federal Land) to 8.5 (Resource Management) for approximately 82.19 acres; b) ZCC # 2, Map 195 from existing Zone District A-1 (Limited Agriculture) to A (Exclusive Agriculture) for approximately 5,291.55 acres and from A-1 MH (Limited Agriculture - Mobile Home Combining) to A for approximately 146.71 acres.; c) ZCC #57, Map 196 from existing Zone District M-3 PD (Heavy Industrial - Precise Development Combining) to M-1 PD (Light Industrial - Precise Development Combining) for approximately 477.39 acres and M-2 PD (Medium Industrial – Precise Development Combining) to M-1 PD for approximately 141.43 acres; d) Issuance of CUP #1, Map 195 to allow for the construction and operation of a 5,438.26-acre PV solar facility with a total project generating capacity, in both Kern County and California City, of up to 1,500 MW of alternating current power and 1,500 MW hours of storage capacity within the A (Exclusive Agriculture) pursuant to Section 19.12.030.G of the Kern County Zoning Ordinance; e) Issuance of CUP #57, Map 196 to allow for the construction and operation of a 830.87-acre PV solar facility with a total project generating capacity, in both Kern County and California City, of up to 1,500 MW of alternating current power and 1,500 MW hours of storage capacity within the A (Exclusive Agriculture) District pursuant to Section 19.12.030.G, M-1 PD (Light Industrial - Precise Development Combining) District pursuant to Section 19.36.030.G, and M-3 PD (Heavy Industrial - Precise Development Combining) District pursuant to Section 19.40.030.G of the Kern County Zoning Ordinance; f) GPA #3, Map 195 to amend the Circulation Element of the Kern County General Plan to remove road reservations on section and mid-section lines within the Kern County project boundaries; g) SPA #31, Map 196 to amend the Circulation Element of the Mojave Specific Plan to remove road reservations on section and mid-section lines within the Kern County project boundaries; and h) Non-Summary Vacations of Public Access Easements within the Project Boundaries. California City (Responsible Agency): a) For the parcels within California City city-limits, a Conditional Use Permit (CUP) must be obtained from the City to allow for the construction and operation of a solar facility, in the O/RA (Open Space/Residential Agricultural) zone (CUP 19-03), of a 2,102.63-acre PV solar facility with a total project generating capacity, in both Kern County and California City, of up to 1,500 MW of alternating current power and 1,500 MW hours of storage capacity. The project proponent has requested to remove the future section and mid-section lines for the portion of the project within the City of California City’s jurisdiction. The City will determine during the CUP process (Sec. 9-2-2501 of the California City Municipal Code) what section lines will be required to be preserved and what ones will be removed. This document is Volume 7, Response to Comment of the Final EIR

Contact Information

Name
Mark Tolentino
Agency Name
Kern County Planning and Natural Resources Department
Contact Types
Lead/Public Agency

Location

Cities
California City, Mojave
Counties
Kern
Regions
Unincorporated
Cross Streets
Altus Avenue & State Route 58
Zip
93501
Total Acres
8,371
Jobs
25
Parcel #
multiple
State Highways
SR 58; Hwy 14
Railways
Southern Pacific Railroad
Airports
Mojave Air and Spaceport
Schools
None
Waterways
None
Township
11N
Range
Mult.
Section
Mult.
Base
SBB&M
Other Location Info
The project site is located east of the community of Mojave and the Mojave Air and Space Port Airport, straddling State Route (SR) 58, and is just west and south of the Hyundai Proving Ground. SR-58, a four-lane divided highway, provides regional access to the project site. Primary access to the site would be from Altus Avenue. The site is located within Township 11N, Range 11W, in all or portions of Sections 5, 6, 7, 17, 18, 19, 20, 21, 22, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, and 35 and within Township 11N, Range 12W in portions of Sections 1 and 2, San Bernardino Base and Meridian, County of Kern, State of California.

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Fish and Wildlife, Central Region 4 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Resources Recycling and Recovery, California Department of Transportation, District 6 (DOT), California Department of Transportation, District 9 (DOT), California Department of Transportation, Division of Aeronautics (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Energy Commission, California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Lahontan Victorville Region 6 (RWQCB), Department of Toxic Substances Control, Office of Historic Preservation
Development Types
Power:Solar (PV Solar)(Megawatts 1500), Power:Other Power Type (Battery Storage)(Megawatts 1500)
Local Actions
General Plan Amendment, Rezone, Use Permit, Specific Plan Amendment/Non-Summary Vacations of Public Access Easements
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire

Attachments

Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print