Newell Creek Pipeline (Felton/Graham Hill) Replacement Project

7 Documents in Project

Summary

SCH Number
2021010166
Lead Agency
City of Santa Cruz
Document Title
Newell Creek Pipeline (Felton/Graham Hill) Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
8/14/2024
Document Description
The Project consists of the southern segment of the proposed Newell Creek Pipeline which extends from the Felton Booster Pump Station (FBPS) to the Graham Hill Water Treatment Plant (GHWTP). The Project includes installation of approximately 25,872 feet of new 24-inch pipeline within existing road pavement, road right-of-way, and/or existing City easements along Graham Road from the FBPS to Pipeline Road, and it will replace the southernmost section of existing pipeline located in Graham Hill Road from Pipeline Road to the GHWTP.

Contact Information

Name
Cedric Irving
Agency Name
State Water Resources Control Board
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Felton, Santa Cruz
Counties
Santa Cruz
Regions
Citywide, Unincorporated
Other Information
The northern terminus of the pipeline is approximately located at the intersection of E Zayante Road and Graham Hill Road in Felton, California (CA). Within City rights-of-way, the project pipeline extends along Pipeline Road to the intersection of Pipeline Road to Graham Hill Road in Santa Cruz, CA. The pipeline then extends to its southern terminus at the Graham Hill Water Treatment Plant located at 715 Graham Hill Rd, Santa Cruz, CA 95060.

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Santa Cruz
Final Environmental Document Available at
City of Santa Cruz, Water Dept. Engineering; 212 Locust Street, Suite C, Santa Cruz, CA 95060

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.