Newell Creek Pipeline Replacement Project
Summary
- SCH Number
- 2021010166
- Lead Agency
- City of Santa Cruz
- Document Title
- Newell Creek Pipeline Replacement Project
- Document Type
- NOP - Notice of Preparation
- Received
- Present Land Use
- Residential-Commercial-Park / Multiple / Multiple
- Document Description
- The Project consists of replacement of 8.75 miles of the existing Newell Creek Pipeline with a new 24- inch polyvinyl chloride (PVC), ductile iron or high-density polyethylene (HDPE) pipeline. The pipeline generally would be installed within existing road pavement, road right-of-way (ROW), and/or existing SCWD easements. The proposed northern segment etends from the Newell Creek Access Road Bridge to the Felton Booster Pump Station on Graham Hill Road at Zayante Road. The proposed southern segment.
- Contact Information
-
Doug Valby
City of Santa Cruz Water Development Dept
Lead/Public Agency
212 Locust Street, Suite C
Santa Cruz, CA 95060
Phone : (831) 212-5501
dvalby@cityofsantacruz.com -
Doug Valby, Associate Civil Engineer
Project Applicant
Location
- Cities
- Santa Cruz
- Counties
- Santa Cruz
- Regions
- Citywide
- Cross Streets
- Graham Hill Road, Glen Arbor Road, Newell Creek Road
- Zip
- Multiple
- Total Acres
- 8.75 miles
- Parcel #
- NA
- State Highways
- 9
- Railways
- Roaring Camp
- Airports
- None
- Schools
- San Lorenzo Valley High
- Waterways
- San Lorenzo River, Newell Creek, Zayante Creek
Notice of Completion
- Review Period Start
- Review Period End
- Development Type
- Water Facilities (Type Water Pipeline)
- Local Action
- Infrastructure
- Project Issues
- Cultural Resources Growth Inducement
- Reviewing Agencies
- California Air Resources Board (ARB) California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW) California Department of Forestry and Fire Protection (CAL FIRE) California Department of Parks and Recreation California Department of Transportation, District 5 (DOT) California Department of Water Resources (DWR) California Governor's Office of Emergency Services (OES) California Highway Patrol (CHP) California Natural Resources Agency California Public Utilities Commission (CPUC) California Regional Water Quality Control Board, Central Coast Region 3 (RWQCB) California State Lands Commission (SLC) Department of Toxic Substances Control Office of Historic Preservation State Water Resources Control Board, Division of Drinking Water State Water Resources Control Board, Division of Water Quality State Water Resources Control Board, Divison of Financial Assistance California Native American Heritage Commission (NAHC)
Attachments
- Environmental Document
- NOP Newell Creek Pipeline Replacement Project PDF 4233 K
- NOC
- NOC Newell Creek Pipeline Replacement Project PDF 746 K
- State Comments
- 2021010166_NAHC Comment PDF 286 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.